Sur son site l’IAF répond par FAQ Q10 de la façon suivante :
(Management system certification, Product certification, Certification of persons, Validation and Verification), how are conformity assessment activities to be managed in this extraordinary period?
A10: In consideration of this extraordinary period, for schemes of management system certification, product certification and certification of persons under IAF MLA, if it is not possible to perform evaluation activities (physically or as per IAF MD4: 2018), such as audits or exams, and if the conditions recommended by IAF ID3: 2011 are satisfied, all the conformity assessment activities (e.g. surveillances, recertification) may be postponed for up to 6 months, and the validity of any output of any conformity assessment activity (e.g. a certificate or report) may be extended for a corresponding period of up to 6 months. In this last instance, in order to document this to the client, if applicable, it is strongly suggested to issue an extension letter, which ratifies this extended validity and its period. This is essential to guarantee transparency and a correct communication to the external market. Appropriate records should also be updated. However, this could change for specific schemes. For validation and verification, particularly the greenhouse gas (GHG) validation and verification at project or organizational level, they are normally one-off conformity activities, therefore the IAF ID3 guidelines related to surveillance, recertification, extension of certification and recertification cycle etc. may not be applicable. However, for the assessment and accreditation of validation and verification bodies (VVBs), IAF ID3 can be used (see A11), and the remote approaches as per IAF MD4:2018 can be used by both ABs and VVBs (see A12).
Updated on 23/03/2020 to include all IAF MLA main scopes.
Site: https://iaffaq.com/
Explication des termes: Physically = « en présentielle » ; as per IAF MD4 :2018 = « à distance, par exemple par Skype ».
Il vous faudra demander une analyse de risques à votre chargé d'affaires ainsi qu’une lettre d’extension.
L’IAF ID3 :2011 définit :
2.1 Extraordinary event or circumstance: A circumstance beyond the control of the organization, commonly referred to as “Force Majeure” or “act of God”. Examples are war, strike, riot, political instability, geopolitical tension, terrorism, crime, pandemic, flooding, earthquake, malicious computer hacking, other natural or man-made disasters.
L’IAF ID3 :2011 précise concernant la re-certification dans ces circonstances :
Normally the recertification audit must be completed and the recertification decision made prior to expiration to avoid loss of certification (ISO/IEC 17021:2011, 9.1.1.2). However, providing that sufficient evidence has been collected as above, to provide confidence that the certified management system is effective consideration may be given to extend the certification for a period not normally exceeding 6 month beyond the original expiry date.
The re-certification should be carried out within this permissible extended period. Otherwise, a new initial audit should be performed. The expiration of the renewed certification should be based on the original recertification cycle.
Dans ce texste « … evidence collected as above… » pointe à l’analyse de risque.
Avec la lettre d’extension il n’y aura pas de perte d’antériorité, si l’audit se termine dans les 6 mois d’extension du certificat.